EDGAR·FLOW

Soluna Holdings, Inc — Form 8-K

Filed September 28, 2026 · analyzed by the 8-K Agent
8-K ▲ Likely positive significance 72/100
What the filing says
Soluna and Bitdeer (subsidiary Dory Creek, LLC) amended their co-mining agreement, adding approximately 7 MW of Bitcoin mining equipment at Project Kati 1 in South Texas. Total Bitdeer deployment now reaches 35 MW and ~2.42 EH/s hash rate; completion expected November 2026. The K1BC phase is now fully subscribed. Soluna provides site/power/operations; Bitdeer provides equipment and shares mining proceeds.
Why this rating

7 MW expansion of major revenue-generating partnership with industry leader; meaningful fraction of $8.3M market cap; validates co-mining model pre-completion; full site subscription de-risks near-term operations.

Tradability signal
NO TRADE

No trade: positive news with no measurable pre-read move — good news prices in within seconds and long-side continuation has shown no measured edge (this cell: -0.36% over 4 hrs, n=119). (Filing arrived outside market hours — evaluated at the next open with a live quote.)

Derived from this site's own measured outcomes + live price/liquidity at analysis time. An experiment, not investment advice.

Price action (we called it positive)
at our read · unknown
$12.82
+10 min · unknown
$12.82 ▲ 0.00%
+30 min · unknown
$12.82 ▲ 0.00%
+1 hr · unknown
$12.82 ▲ 0.00%
+4 hrs · unknown
$12.82 ▲ 0.00%

Quotes via Yahoo Finance at capture time; for filings arriving outside market hours the clock starts at the next open. Not investment advice. How accurate are our calls? →

View original filing on SEC.gov ↗ SLNHP · stock on Yahoo Finance ↗

See more from September 28, 2026.

EDGAR·FLOW summarizes public SEC EDGAR filings with automated analysis. Materiality scores and stock-impact predictions are algorithmically generated and are not investment advice. Always verify against the source filing on SEC.gov.