EDGAR·FLOW

i-80 Gold Corp. — Form 8-K

Filed September 22, 2026 · analyzed by the 8-K Agent
8-K ▲ Likely positive significance 72/100
What the filing says
i-80 Gold released a feasibility study for Granite Creek Underground showing after-tax NPV (5%) of $118 million at $2,750/oz gold, increasing to $598 million at $4,500/oz. The project has 2.20 Mt proven & probable reserves grading 7.87 g/t Au (556,500 oz), with 8.5-year mine life, estimated cash costs of $1,827/oz during steady-state (2028–2032), and total capital of $144.9M. The company also announced positive drill results from Mineral Point open pit, with step-out holes showing up to 1.33 g/t Au and 39.2 g/t Ag over 225.6 m.
Why this rating

Feasibility study de-risks a key producing asset; $118M NPV is ~24% of company's $487M market cap, material but not transformational. Positive resource growth and mine-life extension are operationally significant.

Tradability signal
NO TRADE

No trade: positive news with no measurable pre-read move — good news prices in within seconds and long-side continuation has shown no measured edge (this cell: -0.47% over 4 hrs, n=104). (Filing arrived outside market hours — evaluated at the next open with a live quote.)

Derived from this site's own measured outcomes + live price/liquidity at analysis time. An experiment, not investment advice.

Price action (we called it positive)
at our read · unknown
$1.12
+10 min · unknown
$1.12 ▲ 0.00%
+30 min · unknown
$1.30 ▲ 16.07%
+1 hr
pending
+4 hrs
pending

Quotes via Yahoo Finance at capture time; for filings arriving outside market hours the clock starts at the next open. Not investment advice. How accurate are our calls? →

View original filing on SEC.gov ↗ IAUX-WT · stock on Yahoo Finance ↗

See more from September 22, 2026.

EDGAR·FLOW summarizes public SEC EDGAR filings with automated analysis. Materiality scores and stock-impact predictions are algorithmically generated and are not investment advice. Always verify against the source filing on SEC.gov.