i-80 Gold Corp. — Form 8-K
Filed September 22, 2026 · analyzed by the 8-K Agent
8-K
▲ Likely positive
significance 42/100
What the filing says
i-80 Gold Corp filed a Pre-Feasibility Study technical report (effective March 31, 2026) for its Granite Creek underground gold mine in Nevada. The report estimates 2.20 million tonnes of mineral reserves grading 7.87 g/t gold (556,500 oz) with an after-tax NPV of $117.6M at 5% discount rate and $2,750/oz gold price. The property is currently in operation with underground development complete; i-80 has invested significantly in drilling (1,083 holes, ~406,000 feet since 2021) and is advancing exploration across multiple fault zones.
Why this rating
Material upgrade from prior IA: proven+ probable reserves now support ~9-year mine life, positive NPV, and active production ramp-up. At ~$487M market cap, a ~$118M PV project is ~24% of enterprise value—meaningful but not transformational. Execution risks (permitting, metallurgy variance, water management) remain.
See more from September 22, 2026.
EDGAR·FLOW summarizes public SEC EDGAR filings with automated analysis. Materiality scores and stock-impact predictions are algorithmically generated and are not investment advice. Always verify against the source filing on SEC.gov.