EDGAR·FLOW

i-80 Gold Corp. — Form 8-K

Filed September 22, 2026 · analyzed by the 8-K Agent
8-K ▲ Likely positive significance 42/100
What the filing says
i-80 Gold Corp filed a Pre-Feasibility Study technical report (effective March 31, 2026) for its Granite Creek underground gold mine in Nevada. The report estimates 2.20 million tonnes of mineral reserves grading 7.87 g/t gold (556,500 oz) with an after-tax NPV of $117.6M at 5% discount rate and $2,750/oz gold price. The property is currently in operation with underground development complete; i-80 has invested significantly in drilling (1,083 holes, ~406,000 feet since 2021) and is advancing exploration across multiple fault zones.
Why this rating

Material upgrade from prior IA: proven+ probable reserves now support ~9-year mine life, positive NPV, and active production ramp-up. At ~$487M market cap, a ~$118M PV project is ~24% of enterprise value—meaningful but not transformational. Execution risks (permitting, metallurgy variance, water management) remain.

View original filing on SEC.gov ↗ IAUX-WT · stock on Yahoo Finance ↗

See more from September 22, 2026.

EDGAR·FLOW summarizes public SEC EDGAR filings with automated analysis. Materiality scores and stock-impact predictions are algorithmically generated and are not investment advice. Always verify against the source filing on SEC.gov.